Similar Posts
Eco-campus du Grand Paris
Home Portfolio Project Information Éco-campus du Grand Paris Architect: Groupe Périphériques Place: VITRY SUR SEINE (94) – ZAC départementale Cherioux Project Owner: ECO CAMPUS DES ARDOINES Mission: Structure, MEP design and site supervision Studies: 2017-2018 Handover: Scheduled for 2020 Budget: 20 Million Euros excluding tax
Electrical Substation
Home Portfolio Project Information Electrical Substation– Shop Drawings Architect: Studio Premier – Paris Place: Villebon – France Mission: Architecture – Shop Drawings – BIM 360 – LOD 400
KMD Mall
Home Portfolio Project Information Mall Architect: CAP Place: Karkouk- Iraq Mission: Architecture, Structure & MEP Design, Execution Drawings & Shop Drawings – BIM 360 – LOD 400
Résidence Blanche Castille
Home Portfolio Project Information ST OUEN L’AUMONE (95) – Résidence Blanche Castille – Construction of 150 housing units and 80 underground parking spaces Architect: ARC.AME Place: St Ouen l’Aumône (95) Project Owner: EMMAÜS HABITAT Mission: Structure and MEP design and site supervision Studies: 2012-2013 Budget: 15.3 M€ excluding tax
Digiteolabs group laboratory
Home Portfolio Project Information PALAISEAU (91) Phase 2 of the Digiteolabs group laboratory Architect: BRS ARCHITECTES Place: PALAISEAU (91) Project Owner: INRIA Mission: Structure and MEP design and site supervision Studies: 2012-2014 Budget: 12.5 Million Euros excluding tax
Beirut Marina & Town Quay
Plot 1: 21,000 m2,
3 basements 20,000 m2
Plot 2: 8,000 m2 retail, restaurants and
terrace